Renewable Energy Projects – Project Enquiry / Consultation Form
Tell GSC about your renewable energy project, objectives, current situation and required support. Detailed technical information is helpful but is not required for an initial discussion.
*
Full Name
*
Company / Organisation
*
Job Title
*
Email
*
Phone
*
Country / Project Location
Antigua And Barbuda
Argentina
Armenia
Aruba
Barbados
Austria
Azerbaijan
Bangladesh
Belarus
Belgium
Belize
Benin
Bermuda
Bhutan
Bosnia and Herzegovina
Bolivia
Bonaire, Sint Eustatius and Saba
Botswana
Bouvet Island
Brazil
British Indian Ocean Territory
Brunei
Bulgaria
Central African Republic
Burkina Faso
Cambodia
Cameroon
Canada
Cape Verde
Cayman Islands
Chad
Chile
Cocos (Keeling) Islands
American Samoa
China
Christmas Island
Colombia
Comoros
Congo
Cook Islands
Costa Rica
Angola
Aland Islands
Albania
Algeria
Australia
Afghanistan
Anguilla
Antarctica
Dominica
Dominican Republic
Estonia
Egypt
El Salvador
Eritrea
Ethiopia
Falkland Islands
Fiji Islands
Faroe Islands
Finland
France
French Polynesia
French Guiana
French Southern Territories
Gabon
Georgia
Germany
Guam
Ghana
Gibraltar
Greece
Greenland
Guadeloupe
Guatemala
Guernsey and Alderney
Guinea
Guinea-Bissau
Guyana
Hungary
Haiti
Heard Island and McDonald Islands
Honduras
Hong Kong S.A.R.
Iceland
India
Indonesia
Gambia The
Iran
Cote D'Ivoire (Ivory Coast)
Curaçao
Democratic Republic of the Congo
Cuba
Denmark
Cyprus
Croatia
Djibouti
Ecuador
Kenya
Kiribati
Laos
Kosovo
Kyrgyzstan
Lithuania
Latvia
Lebanon
Liberia
Libya
Liechtenstein
Luxembourg
Macau S.A.R.
Madagascar
Malawi
Mali
Malaysia
Maldives
Malta
Marshall Islands
Man (Isle of)
Martinique
Mauritania
Morocco
Mauritius
Mayotte
Micronesia
Moldova
Monaco
Mongolia
Montenegro
Montserrat
Mozambique
Myanmar
Namibia
Nauru
Nepal
Netherlands
Jersey
New Caledonia
Macedonia
Ireland
Italy
Israel
Kuwait
Jamaica
Iraq
Jordan
Kazakhstan
Norway
Oman
Pakistan
Palau
Palestinian Territory Occupied
Peru
Papua new Guinea
Philippines
Poland
Pitcairn Island
Portugal
Qatar
Puerto Rico
Reunion
Saint Kitts And Nevis
Romania
Russia
Rwanda
Saint Helena
Saint Lucia
Saint Vincent And The Grenadines
Saint Pierre and Miquelon
Saint-Barthelemy
Saint-Martin (French part)
San Marino
Sao Tome and Principe
Saudi Arabia
Senegal
Serbia
Sierra Leone
Seychelles
Singapore
Sint Maarten (Dutch part)
Slovakia
Slovenia
Solomon Islands
South Korea
Somalia
South Africa
South Georgia
South Sudan
Nicaragua
Niger
North Korea
Norfolk Island
Nigeria
New Zealand
Panama
Northern Mariana Islands
Western Sahara
Vanuatu
Vatican City State (Holy See)
Grenada
Vietnam
Virgin Islands (British)
Thailand
Tunisia
Togo
Yemen
Zambia
Zimbabwe
Sweden
Sudan
Svalbard And Jan Mayen Islands
Tonga
Switzerland
Suriname
Tanzania
Trinidad And Tobago
Syria
Taiwan
Tuvalu
United States Minor Outlying Islands
Uzbekistan
Venezuela
Turkmenistan
Virgin Islands (US)
Wallis And Futuna Islands
Uganda
The Bahamas
Tokelau
Turkey
United Arab Emirates
Ukraine
United Kingdom
United States
Turks And Caicos Islands
Andorra
Burundi
Equatorial Guinea
Lesotho
Sri Lanka
Mexico
Bahrain
Czech Republic
Swaziland
Japan
Spain
Niue
Paraguay
Samoa
Tajikistan
East Timor
Uruguay
*
Organisation Type
Government / public institution
Utility / network operator
Renewable-energy developer / IPP
Industrial / commercial organisation
EPC / engineering company
Investor / lender
Asset owner / operator
Development institution
Other
*
Renewable Energy Project Type
Utility-scale solar PV
Rooftop / C&I solar PV
Ground-mounted solar PV
Wind energy
Solar-wind hybrid
Renewable energy + BESS
Renewable-powered microgrid
Off-grid / remote system
Renewable energy for green hydrogen
Technology not yet selected
Other
*
Main Project Requirement
Develop project concept
Site / resource assessment
Feasibility study
Energy-yield assessment
System sizing / optimisation
Grid connection
BESS / hybrid integration
Engineering design
CAPEX/OPEX / LCOE assessment
Technical due diligence
Tender / EPC support
Construction / commissioning support
Existing asset performance improvement
Other
*
Support Required from GSC
Opportunity / site assessment
Pre-feasibility / feasibility
Solar / wind resource assessment
Energy-yield modelling
Load and demand analysis
System sizing and optimisation
Grid-connection / grid-code study
BESS / hybrid-system integration
Engineering / design review
Techno-economic assessment
Technical due diligence
Owner's Engineer
Technical specifications / tendering
Bid / EPC evaluation
Construction supervision / technical support
Testing / commissioning
Performance optimisation
*
Project Stage
Idea / concept
Site identification
Pre-feasibility
Feasibility
Development / permitting
Basic engineering
Detailed engineering
Procurement / tendering
Construction
Commissioning
Operation / optimisation
Not yet determined
*
Target renewable capacity, if known (MW / kWp)
*
Site / roof area, if known
*
Annual electricity consumption, if relevant
*
Peak demand, if relevant
*
Available wind measurements
*
Project Objectives
Reduce grid electricity cost
Improve energy security
Reduce emissions
Meet renewable-energy targets
Develop an investment project
Supply an industrial facility
Supply a microgrid / remote site
Support green-hydrogen production
Increase renewable self-consumption
Other
*
Grid connection voltage / capacity, if known
*
Turbine assumptions, if known
*
Timeline
Immediate / 1–3 months
3–6 months
6–12 months
12–24 months
Long-term development
Not yet determined
*
Briefly describe your project
*
Storage purpose
*
Target BESS power (MW)
*
Target BESS energy capacity (MWh)
*
Renewable generation profile
*
Operating strategy
*
Electricity tariff
*
Electricity consumption profile
*
Self-consumption objectives
*
Electrolyser target capacity
*
Hydrogen production target
*
Operating profile
*
Renewable-power requirements
*
Available Documents / Data
Site plan / roof drawings
Electricity bills / load data
Solar irradiation data
Wind data
Grid-connection information
Existing feasibility study
Technical specifications
Tender / EPC documents
Financial assumptions
Other documents
*
Please specify other project type
*
Upload supporting documents
Select File
Drag & Drop files here or click to upload
*
Preferred Initial Engagement
Introductory consultation
Preliminary technical assessment
Feasibility discussion
Request for proposal
Investment / due-diligence discussion
Tender / bid support
Not sure – please advise
*
Please specify other requirement
*
Please specify other objective
*
Please specify other organisation type
*
Usable roof / land area
*
Solar project type
Rooftop
Ground-mounted
Floating
Other / not yet determined
*
Target solar capacity
*
Available irradiation data
*
Roof / land constraints
*
Peak demand
*
Wind site location
*
Target wind capacity
Submit