108 kWp Grid-Connected Solar PV Feasibility & Performance Analysis – Ghadames, Libya
Standort: Ghadames, Libyen
Branche: Erneuerbare Energien
Projekttyp: Solar-PV-Bewässerungspumpsystem, ca. 1,1 MWp Konzeptkapazität
Geschäftsbereich: Engineering Excellence | Strategic Advisory
Projekthintergrund

GSC entwickelte im Rahmen des Ghadames Olive & Palm Project ein Engineering-Konzept für solarbetriebene Bewässerung zur Unterstützung des Oliven- und Palmenanbaus in Libyen. Das System soll dieselbasiertes Pumpen durch ein rund 1,1-MWp-Solar-PV-Bewässerungspumpsystem ersetzen und die Nachhaltigkeit der landwirtschaftlichen Wasserversorgung verbessern.

Projektziele
  • Assess solar resource and expected energy yield.
  • Review electrical design, inverter sizing and grid integration.
  • Optimise layout to minimise shading and electrical losses.
  • Evaluate financial feasibility over a long-term assessment period.
  • Provide recommendations for reliable solar deployment in Libya.
Engineering- / Delivery-Herausforderungen
  • Hohe Brennstoffabhängigkeit bei abgelegener Bewässerung
  • Harte Wüstenbedingungen
  • Bedarf an zuverlässiger Wasserversorgung und effizienter Pumpenregelung
  • Skalierbare und wartbare Renewable-Energy-Architektur
GSC Engineering-Ansatz & Methodik

GSC entwickelte Solar-PV-Engineering und Bewässerungsstromsystemdesign in Verbindung mit Wasserpumpen-Engineering und einem Konzept für drehzahlgeregelte Pumpen. Der Ansatz umfasste elektrischen Schutz und Monitoring sowie Auslegungsaspekte für Wüstenbedingungen und zukünftige Systemerweiterung.

Detaillierter Leistungsumfang
  • Solar-PV-Engineering und Bewässerungsstromsystemdesign
  • Wasserpumpen-Engineering
  • Konzept für drehzahlgeregelte Pumpen
  • Elektrischer Schutz und Monitoring
  • Auslegung für Wüstenbedingungen und zukünftige Erweiterung
Engineering Highlights & geschaffener Wert
  • PV generator output: 108 kWp.
  • 432 PV modules and 6 KACO Powador 20.0 TL3 inverters in the source simulation.
  • Generator surface: approximately 721.4 m².
  • Annual grid feed-in: approximately 205,270 kWh/year.
  • Specific annual yield: approximately 1,900.65 kWh/kWp.
  • Performance Ratio: 80.1%.
  • Yield reduction due to shading: approximately 0.8%/year.
  • Avoided CO₂ emissions: approximately 123,116 kg/year.
  • Assessment period: 20 years.
  • Modelled return on assets: approximately 15.19%; amortisation period: approximately 6.6 years.
Technologien, Methoden & Standards
  • PV*SOL Premium
  • KACO Powador 20.0 TL3
  • Grid-connected PV
  • Energy-yield modelling
  • Performance Ratio analysis
  • Financial analysis
Nachhaltigkeits- / Business Impact

The case demonstrates GSC's approach of connecting engineering decisions with reliability, lifecycle value, operational performance and sustainability. Where quantified results are shown above, they are retained from the underlying project material and should not be altered by the website developer.

Erkenntnisse & übertragbarer Wert

High solar irradiation alone does not guarantee a strong PV project. Temperature losses, inverter configuration, shading, grid interface and financial assumptions must be modelled together to convert resource potential into a credible investment case.

GSCTS
BESPRECHEN SIE EIN ÄHNLICHES PROJEKT

Arbeiten Sie mit GSC zusammen, um komplexe Herausforderungen in den Bereichen Ingenieurwesen, Energie und Infrastruktur in praktische, nachhaltige Lösungen umzuwandeln, die die Leistung verbessern, die Widerstandsfähigkeit stärken und dauerhaften Wert schaffen.

Have a strategic, engineering or project-delivery challenge? Talk to GSC about the next step.

Sage Davis
Software Engineer

Hello! How may we assist you today?